Estimating Required Contingency Funds for Construction Projects Using Multple Linear Regression

Kód: 08244202

Estimating Required Contingency Funds for Construction Projects Using Multple Linear Regression

Autor Jason J Cook

Cost overruns are a critical problem for construction projects. The common practice for dealing with cost overruns is the assignment of an arbitrary flat percentage of the construction budget as a contingency fund. This research s ... celý popis

69.54


Skladom u dodávateľa
Odosielame za 14 - 18 dní
Pridať medzi želanie

Mohlo by sa vám tiež páčiť

Darujte túto knihu ešte dnes
  1. Objednajte knihu a vyberte Zaslať ako darček.
  2. Obratom obdržíte darovací poukaz na knihu, ktorý môžete ihneď odovzdať obdarovanému.
  3. Knihu zašleme na adresu obdarovaného, o nič sa nestaráte.

Viac informácií

Viac informácií o knihe Estimating Required Contingency Funds for Construction Projects Using Multple Linear Regression

Nákupom získate 172 bodov

Anotácia knihy

Cost overruns are a critical problem for construction projects. The common practice for dealing with cost overruns is the assignment of an arbitrary flat percentage of the construction budget as a contingency fund. This research seeks to identify significant factors that may influence, or serve as indicators of, potential cost overruns. The study uses data on 243 construction projects over a full range of project types and scopes gathered from an existing United States Air Force construction database. The author uses multiple linear regression to analyze the data and compares the proposed model to the common practice of assigning contingency funds. The multiple linear regression model provides better predictions of actual cost overruns experienced. Based on the performance metric used, the model sufficiently captures 44% of actual cost overruns versus current practices capturing only 20% The proposed model developed in this study only uses data that would be available prior to the award of a construction contract. This allows the model to serve as a planning tool throughout the concept and design phases. The model includes project characteristics, design performance metrics, and contract award process influences.

Parametre knihy

Zaradenie knihy Knihy po anglicky Society & social sciences Education

69.54

Obľúbené z iného súdka



Osobný odber Bratislava a 2642 dalších

Copyright ©2008-24 najlacnejsie-knihy.sk Všetky práva vyhradenéSúkromieCookies


Môj účet: Prihlásiť sa
Všetky knihy sveta na jednom mieste. Navyše za skvelé ceny.

Nákupný košík ( prázdny )

Vyzdvihnutie v Zásielkovni
zadarmo nad 59,99 €.

Nachádzate sa: